A2A
Thermoelectric
Power
Plant
of
Brindisi

Services

Remediation and demolition

Period

2017 - 2019

Client

A2A Energie Future Spa

DESCRIPTION

Asbestos remediation, plant decontamination, and demolition of two boiler back-end units (GR1 and GR2)

DESCRIPTION

The remediation/demolition works involved the compressor building, electrostatic precipitators and their related electrical switchgear rooms, flue gas ducts, and the chimneys of units 1-2, including their supporting structures and heavy ash storage silos. Additionally, the project included the decontamination and demolition of OCD and diesel pipelines, the demolition of the connecting pipe rack between units 1-2, and the “gas free” remediation of the OCD system for units 1-2. This included the disposal of residual fuel oil and the demolition of equipment, pipelines, electrical systems, and structures in the boiler back-end area and flue gas ducts up to the chimneys.

DESCRIPTION

Demolition of the non-operational boiler back-end equipment of units 1-2 at the A2A Brindisi Power Plant and gas-free remediation of the OCD fuel supply system for both units.

Our work in numbers

tons of scrap metal

height of the smoke chimneys

workers

operating machines (3 excavators, 1 self-propelled loader, 1 truck-mounted crane)

logo

Noi e terze parti selezionate utilizziamo cookie o tecnologie simili per finalità tecniche e, con il tuo consenso, anche per le finalità di esperienza e misurazione come specificato nella cookie policy.

Puoi liberamente prestare, rifiutare o revocare il tuo consenso, in qualsiasi momento, accedendo al pannello delle preferenze. Il rifiuto del consenso può rendere non disponibili le relative funzioni.

Usa il pulsante “Accetta” per acconsentire. Chiudi questa informativa per continuare senza accettare.