A2A–WaterTowers(PiezometricTowers)
Services
Demolition
Period
2019 - 2020
Client
A2A Ciclo Idrico Spa
Services
Demolition
Period
2019 - 2020
Client
A2A Ciclo Idrico Spa
CLIENT COMMISSION
Demolition of 4 piezometric towers
TECHNICAL DETAILS
Demolition of a reinforced concrete elevated tank with external brick cladding, supported by reinforced concrete pillars connected by concrete beams, height: 24.00 m
Demolition of a reinforced concrete tank with external brick cladding, supported by reinforced concrete pillars connected by concrete beams, height: 32.00 m
Demolition of a metal tank with polyurethane insulation, supported by 4 L-shaped reinforced concrete pillars, height: 28.50 m
Demolition of a metal tank with polyurethane insulation, supported by 6 reinforced concrete pillars connected by concrete beams, height: 27.60 m
WHAT WE DID
Demolition of four elevated tanks (known as piezometric towers) located in the province of Brescia.
Our work in numbers
towers demolished
maximum height of the demolished structures (METERS)








Noi e terze parti selezionate utilizziamo cookie o tecnologie simili per finalità tecniche e, con il tuo consenso, anche per le finalità di esperienza e misurazione come specificato nella cookie policy.
Puoi liberamente prestare, rifiutare o revocare il tuo consenso, in qualsiasi momento, accedendo al pannello delle preferenze. Il rifiuto del consenso può rendere non disponibili le relative funzioni.
Usa il pulsante “Accetta” per acconsentire. Chiudi questa informativa per continuare senza accettare.