Municipality
of
Crema

Services

Demolition and remediation

Period

2020 - 2021

Client

Municipality of Crema

DESCRIPTION

Demolition of part of the industrial complex known as “Ex Ferriera” located in Via Gaeta, Crema (CR).

DESCRIPTION

Demolition of buildings with reinforced concrete load-bearing structures and brick infill walls, covered with bituminous membrane roofing, with variable heights ranging from 6.50 m to 21 m, totaling a volume of approximately 73,000 m³. Remediation and removal of asbestos-containing roofing, totaling 570 m².

DESCRIPTION

Demolition of buildings located in the northern part of the Municipality of Crema, in the area known as “Ex Ferriera,” in the Santa Maria della Croce district, bordered to the north by Via Gaeta and to the south by the railway.

Our work in numbers

maximum building height (METERS)

total demolished volume

asbestos roofing remediated and removed

logo

Noi e terze parti selezionate utilizziamo cookie o tecnologie simili per finalità tecniche e, con il tuo consenso, anche per le finalità di esperienza e misurazione come specificato nella cookie policy.

Puoi liberamente prestare, rifiutare o revocare il tuo consenso, in qualsiasi momento, accedendo al pannello delle preferenze. Il rifiuto del consenso può rendere non disponibili le relative funzioni.

Usa il pulsante “Accetta” per acconsentire. Chiudi questa informativa per continuare senza accettare.