CLIENT COMMISSION
Decommissioning of a cogeneration plant inside the Barilla factory
TECHNICAL DETAILS
Demolition of the main power generation unit of the combined-cycle thermal power plant (CTE), consisting of:
a 30 MW General Electric LM2500 natural gas turbine with a 40.8 MVA Brush alternator
a GVR Pensotti with afterburner and a 30-meter-high / 5.6-meter-diameter chimney
a 10 MW Turbomach Marc 4 condensing steam turbine
a 12 MVA Leroy Somer alternator coupled to the steam turbine
a shell-and-tube condenser for the steam turbine, complete with auxiliaries
an 8-cell modular evaporative cooling tower for the condenser and plant auxiliaries, with forced draft and 3 recirculation pumps
a step-up transformer T1 and a unit transformer TRA (resin-insulated) for auxiliary services of the gas and steam turbines and general plant services
pipe racks
WHAT WE DID
Remediation and demolition of the thermoelectric unit, tanks, various systems, and civil works.
Our work in numbers
tons of recovered scrap metal
tons of waste disposed of, including 62 tons of hazardous waste
chimneys, each 30 meters high, demolished
Noi e terze parti selezionate utilizziamo cookie o tecnologie simili per finalità tecniche e, con il tuo consenso, anche per le finalità di esperienza e misurazione come specificato nella cookie policy.
Puoi liberamente prestare, rifiutare o revocare il tuo consenso, in qualsiasi momento, accedendo al pannello delle preferenze. Il rifiuto del consenso può rendere non disponibili le relative funzioni.
Usa il pulsante “Accetta” per acconsentire. Chiudi questa informativa per continuare senza accettare.