CTE
Montalto
di
Castro

Services

Demolition and remediation

Period

2021 – 2023

Client

Enel Produzione Spa

DESCRIPTION

Plant remediation and demolition of two boiler back-end units (Group 1 and Group 2)

DESCRIPTION

Demolition of:

  • Combustion air preheating system
  • Selective catalytic reduction (SCR) system
  • Electrostatic precipitator
  • Electrical switchgear room
  • Air and flue gas ducts
  • Ash storage system
  • Pipe rack
  • DeNOx reagent stripping system
  • Compressor building
  • Tanks
  • Valve cabin and demineralized water pump system
DESCRIPTION

Remediation and demolition of the boiler back-end systems for thermoelectric units 1 and 2.

Our work in numbers

tons of recovered metal scrap

logo

Noi e terze parti selezionate utilizziamo cookie o tecnologie simili per finalità tecniche e, con il tuo consenso, anche per le finalità di esperienza e misurazione come specificato nella cookie policy.

Puoi liberamente prestare, rifiutare o revocare il tuo consenso, in qualsiasi momento, accedendo al pannello delle preferenze. Il rifiuto del consenso può rendere non disponibili le relative funzioni.

Usa il pulsante “Accetta” per acconsentire. Chiudi questa informativa per continuare senza accettare.